image description

Ductwork Information Sheet

INFORMATION SHEET TESTING TO AS 4254.1-2012 DUCTWORK FOR AIR HANDLING SYSTEMS IN BUILDINGS The cost of each of the individual tests as outlined in Section 2.4.2 is as follows: AWTA Code Test Base Fee ($) Per Test GST @ 10% ($) Total Fee ($) T18D T18E T18F T18G T18H T18I T18J T18K T18L T18B Burning Mould growth & humidity Temperature Puncture Static Load Impact Pressure Collapse Tension AS/NZS 1530.3 458 328 346 63 120 120 324 324 120 799 45.80 32.80 34.60 6.30 12.00 12.00 32.40 32.40 12.00 79.90 503.80 360.80 380.60 69.30 132.00 132.00 356.40 356.40 132.00 878.90 Notes: 1. 2. The standard requires that all testing be conducted on 300mm diameter ducting as an assembly. If a core material is tested and passes the pressure, collapse, impact and tension tests, then it does not need to be re-tested for those tests as an insulated duct providing an identical core construction is used. The prices given above are valid until 30 June 2014. FACT SHEET - DUCTWORK, September 2013.doc Australian Wool Testing Authority Ltd ­ trading as AWTA Product Testing A.B.N. 43 006 014 106 st 1 Floor, 191 Racecourse Road, Flemington, Victoria 3031 P.O. Box 240, North Melbourne, Victoria 3051 Phone (03) 9371 2400 Fax (03) 9371 2499 INFORMATION SHEET SAMPLE REQUIREMENTS FOR AS4254.1-2013 DUCTWORK FOR AIR-HANDLING SYSTEMS IN BUILDINGS SAMPLE REQUIREMENTS FOR ALL TESTS 10 x 6m lengths of core plus 3 x 6m lengths of assembled duct Alternatively: SAMPLE REQUIREMENTS FOR AS/NZS 1530.3-1999 Sufficient completed duct material to allow 10 samples each 600mm x 450mm to be formed by flattening of the duct plus sufficient bulk insulation to allow 10 samples each 600mm x 450mm. SAMPLE REQUIREMENTS FOR UL 181-1994 SECTION 9 BURNING TEST 6 lengths by 914mm by 300mm diameter of assembled duct plus; SECTION 11 - MOULD GROWTH AND HUMIDITY TEST 3 pieces 102mm x 102mm of assembled duct. SECTION 12 - TEMPERATURE TEST Low Temperature - 203 x 203mm 3 pieces of assembled duct. High Temperature - 2 pieces - 914mm long x 300mm diameter of assembled duct. SECTION 13 - PUNCTURE TEST 2 pieces 600mm long by 300mm diameter of assembled duct. One of these pieces is used from the high temperature test of assembled duct. SECTION 14 - STATIC LOAD TEST 1 piece 2.43m long by 300mm diameter of assembled duct. SECTION 15 - IMPACT TEST 3 pieces 2.43m long by 300mm diameter. SECTION 17 - PRESSURE TEST See Note 2 on opposite page 3 pieces 2.43m long by 300mm diameter. SECTION 18 - COLLAPSE TEST 3 pieces 2.43m long by 300m diameter. SECTION 19 - TENSION TEST 3 pieces 2.43m long by 300mm diameter. ALSO REQUIRED: * * * * Straps/supports used to hold duct (Static load test). Materials used to join pieces e.g. Tape, adhesives. Instruction of use of joining materials. Instructions and spacing of supports for static load test Section 14. FACT SHEET - DUCTWORK, September 2013.doc Australian Wool Testing Authority Ltd ­ trading as AWTA Product Testing A.B.N. 43 006 014 106 st 1 Floor, 191 Racecourse Road, Flemington, Victoria 3031 P.O. Box 240, North Melbourne, Victoria 3051 Phone (03) 9371 2400 Fax (03) 9371 2499
File Name: Ductwork Information Sheet.pdf
File Size: 38.73 KB
File Type: application/pdf
Hits: 4534 Hits
Created Date: 04-08-17
Last Updated Date: 29-04-24